Your septic maintenance report, checked line by line — before the county checks it.
For Texas aerobic septic (OSSF) maintenance providers: every report is validated against the state rules and your county's form before it can be marked ready to file — required fields, the provider's signature, test values, and the 14-day filing clock. And a counter tracks your exposure under §285.65: four or more improperly submitted reports in any two-year period are a ground for license suspension.
Try the free demo filing run See pricing
Try the demo right here — no account, no card.
Free: one full filing run a month — validation, county documents and the exposure snapshot included. Pro: $89/month flat per firm, unlimited.
How it works
1. Record the visit
Enter the inspection findings item by item — the state record's own list (Figure 3) — plus the test results, repairs, and the licensed provider's signature.
2. The report has to pass
Blocking validation: a missing permit number, an unsigned report, a chlorine residual under 0.1 mg/L, a county field left blank — any of them keeps the report from being marked ready. No reminders you can click past; the report does not leave until it is complete.
3. File the county's document
You get the document your county takes: the filled county form as a PDF in Denton, the CSV export Fort Bend accepts from third-party software, the state Figure 3 record everywhere else. We prepare and check; you file it yourself — we never file in your name.
The exposure counter
Under 30 TAC §285.65(a)(1)(C), failing to properly submit four or more required reports over any two-year period is a ground for suspension — the rule says a license “can be suspended”, so it is discretionary, never automatic. The counter adds up your late, county-rejected and incomplete filings against that threshold, per system and across the firm, so the number is never a surprise.
What it does
- ✓ Blocking validation, state + county — required fields, the MP signature (§285.7(b)(3)), test thresholds from Table IV, and your county form's own fields, checked before filing, not after a rejection.
- ✓ The 14-day clock, watched — the deadline runs from the date of the test (§285.7(e)(1)(B)), to the permitting authority and the owner. Reports near or past it are flagged before they go out.
- ✓ The right tests for the system — chlorine residual or fecal coliform at every visit for surface application; the annual BOD₅/TSS grab only where the rule asks for it (non-single-family); no lab test invented for subsurface disposal.
- ✓ County documents, generated — Denton's official form filled as a PDF, Fort Bend's CSV export, and the state Figure 3 record for every other county.
- ✓ An exposure counter, not a scare tactic — late, rejected and incomplete filings counted over the rolling 24 months, per-system exposure under §285.65(a)(1)(B), systems going 8 months without maintenance under (a)(1)(A), and local-order violations against the §366.0515(m) threshold of 3.
- ✓ Your history counts too — filings from before you joined can be logged, so the counter covers the full legal window, not just your time here.
Honest limits
- Dedicated county packs for Fort Bend (CSV export) and Denton (county form). Every other county uses the state Figure 3 record.
- Harris County requires a maintenance contract for every permitted OSSF, but the county has not published its periodic report form or filing channel — Harris systems use the state record until the county publishes one. We say so instead of guessing at a form.
- The counter tracks signals from your filings — late, rejected, recorded incomplete. Whether a filing was “improperly submitted” is the commission's call, and suspension is discretionary. This tool measures exposure; it does not guarantee compliance.
- Not affiliated with the TCEQ or any county. Filing remains your responsibility.